26 February 2015

Kitchen

I've had a few inquiries regarding our kitchen changes so I figured since I now have the Kitchen plan I would post it up. The brief was to keep the kitchen simple and streamlined. To achieve this we moved the fridge to the laundry wall, opted for flush line overheads and an integrated rangehood.




Day 2 of Bricking

Day 2 of bricking...


24 February 2015

Bricking!

This week on the block we finally have bricks wooo!


Austral Urban One Chiffon bricks to whole house
Red bricks will be 'Bag N Paint' Shale Grey
Bath cutout now complete and you can now see the dropped larger window 

16 February 2015

8 February 2015

Roof

Roof frame going up! Must admit that we are very pleased with the upgraded 26 degree roof pitch from the standard 22.5!











4 February 2015

We've been Framed :O

Exciting times!! The frame has almost been completely constructed!

We might add some extra noggins to the walls to hold the wall hung TV's, some large photo frames in the dining alcove and entry, towel hooks in the ensuite and bathroom and a few other bits a pieces so we don't have the problem of not being able to hang things where we want them once the walls are up! Little bit of pre-planning can go a long way later down the track. 


I think once the windows are in and the roof is on we will be able to get a good feel for the rooms.



Elevation A

Garage

 Front

 Living + Dining + Windows

 Living

 Kitchen

Roof Trusses